Background
The existing access from the car park to the bin stores was inconvenient and unsuitable for regular use by residents and waste collection teams. Dover District Council required a new, well-structured layout including footpaths and a purpose-built bin store to improve safety, access, and overall site usability.
Works Included
Tarmac Footpaths (Approx. 90sqm):
-
Marking out and scanning for services
-
Excavation to correct formation levels
-
Installation of concrete edgings
-
Geotextile membrane laid with compacted MOT Type 1 sub-base
-
Two-layer tarmac surfacing for durability
-
Surrounding areas reinstated with topsoil for a clean finish
Concrete Pad & Bin Store:
-
Excavation and formation for 12sqm concrete pad
-
Concrete edgings and compacted MOT Type 1 base on membrane
-
Concrete poured to finish the pad
-
Construction of a 1.6m high x 15m long double-skin brickwork bin store
-
Installation of a new pedestrian gate for secure access
Outcome
TM Contract Services delivered a complete access solution that significantly improves functionality and appearance. The new tarmac paths provide safe, practical routes for both residents and bin collection teams. The robust brick bin store and secure gate offer a clean, durable, and professional waste management facility, helping Dover District Council enhance the residential environment with minimal disruption.
Contact us online
Get in touch to see how we can improve your Commercial or domestic premises.
Our Address
Ashford,
TN25 6SS