Grasscrete installation

Case Study – Project Hothfield Grasscrete

Work carried out for Ashford Borough council Sep/Oct 21

  1. Background

The area had minimal parking for residents and visitors resulting in them parking on grass verges and council owned land adjacent to their properties.

  1. Works to include

Section 1 Grasscrete:

  • To dig out an area of 150 sqm to a depth of 200mm
  • Bund as much material around the outside as possible.
  • Lay geotextile membrane
  • Import and compact 100mm of MOT type 1
  • Import and compact a maximum of 40mm of sharp sand
  • Lay plastic grasscrete
  • Infill with soil and grass seed
  • Muck away any leftover soil

Section 2 Tarmac strip:

  • Removing the existing path which was to be left in original
  • Digging out 50 sqm down the centre of the new car park 2.5 metres wide to a depth of 200mm
  • Lay geotextile membrane
  • Import and compact 100mm of MOT Type 1
  • Edge each side of the roadway with PCC edgings
  • Lay 60 mm of 20 mm DBM base course tarmac
  • Lay 40 mm of 10mm SMA waring course tarmac

Lastly dropping the curb from the street for access KCC approved.

  1. Outcome

Extra parking space for residents near their homes, and a dropped curb from the street as can be seen in photos below.

Grasscrete installation

If you have any requirements you need to talk over please contact us for a friendly chat.

Home  

Instagram 

Grasscrete installation Grasscrete installation Grasscrete installation Grasscrete installation Grasscrete installation Grasscrete installation