Large concrete pour, Groundworks and Drainage.

Industrial unit Sittingbourne concrete pour 360 square metres.

Case Study – Project Cooks Floor resurfacing

Work carried for Cooks Sep/Oct 2020

  1. Background

Cooks required an extra warehouse to keep more freezers and stored areas to keep up with their work due to a busy lockdown period, this was our second large phase for this company.

  1. Works to include

 

  • Removal and disposal of approximately 8m wide x 45m long area
  • Level existing floor
  • Lay Membrane with reinforcing mesh
  • Installation of new drains
  • Large concrete pour
  • Shutter up a new base for one freezer
  • Creating a temporary side door so we could access the floor with concrete pipes.

 

  1. Outcome

Brand new concrete poured floor levelled off, with a large pad to store a freezer on. New drains were installed to carry any water out of the building.

If you have any requirements you need to talk over please contact us for a friendly chat.