Large concrete pour, Groundworks and Drainage.
Industrial unit Sittingbourne concrete pour 360 square metres.
Case Study – Project Cooks Floor resurfacing
Work carried for Cooks Sep/Oct 2020
- Background
Cooks required an extra warehouse to keep more freezers and stored areas to keep up with their work due to a busy lockdown period, this was our second large phase for this company.
- Works to include
- Removal and disposal of approximately 8m wide x 45m long area
- Level existing floor
- Lay Membrane with reinforcing mesh
- Installation of new drains
- Large concrete pour
- Shutter up a new base for one freezer
- Creating a temporary side door so we could access the floor with concrete pipes.
- Outcome
Brand new concrete poured floor levelled off, with a large pad to store a freezer on. New drains were installed to carry any water out of the building.
If you have any requirements you need to talk over please contact us for a friendly chat.
Large concrete pour